top of page
McALESTER, OK
McAlester Head Start
A/E SERVICE DATE: 2014
CLIENT: THE CHOCTAW NATION OF OKLAHOMA
SQFT: 7,400
This Head Start project was designed with two classrooms and a third classroom as an optional expansion. Extensive site improvements were required for this entire campus to make the land suitable for construction. Chahta Architecture (then EOTS), also worked as the Program Manager for the entire campus to create the cohesive product that the client desired. The exterior facade consists of cast masonry and a manufactured stone veneer along with a band of EIFS at the top of the masonry.
bottom of page